• Matt Blaze@federate.socialOP
    link
    fedilink
    arrow-up
    1
    ·
    26 days ago

    @fuzzface@epsilon-ix.masto.host I’ve heard that too, but I’m skeptical that it was ever a serious contingency plan. The track layout makes it a rather poor choice for a quick escape, since it would require a fairly lengthy set of reverse switching moves from the siding to get lined up for the Park Avenue tunnel.