• HamsterRage@lemmy.ca
    link
    fedilink
    arrow-up
    1
    ·
    2 months ago

    Generally, with RPN you work from the inside out letting the results from operations inside the brackets sit on the stack until you need them. So the need for Order of Operations isn’t removed, but you don’t need special keys on the calculator for it. You do have to keep track of what’s where on the stack, but this becomes second nature after a while.